Christmas at the lodge is about to occur. I plan to head up to the old place and get it warmed up for this weekend. We plan for guests to start arriving on Saturday. My sister, Pattie and some of her family plan to be there for New Years and we have family coming in from Southern California post Christmas weekend. We may even be lucky to have some of our friends drop in.
The lodge is magical at Christmas and we are fortunate enough to have snow this year. Can't wait to get out the inner tubes and cross country skis.
Some new exciting news! During my last conversation with Eleanor (Cortopassi family ownership from the early 1930s to the late 1940s), she shared that the next owner of the lodge (Mr Robinson) was a prominent attorney from Auburn. After a lot of research, I located information on the Robinson family and I am hoping I have contacted a descendant. I will let you know if this lead pans out.
I plan to go to the county archives this spring to attempt to fill in some of the current history of the last two owners of the lodge. I have not been able to connect with Mrs Bright's children or with Mrs Jimmerson (though I have made several attempts to reach them). I wish them fond memories of their time at the lodge and hope they stop by sometime in the future.
We have some new furniture to haul up (after the holidays). Our dear neighbors provided us with a great dresser for Katie's room. Can't wait to get it up there. But this trip will be about hauling gifts, decorations and food.
Happy Holidays! 2012
Pages
- History 1840 - 1867
- History 1867 - 1900 (and a bit beyond)
- History 1900 - 1925
- History 1925 - 1950
- History 1950 to 2008
- History 2009 Forward
- Posts
- Stories from the Slope
- Summer Swimming and Water Fun
- Hiking Trails and Other Stuff To Do
- Tahoe Christmas's Before the Lodge
- Links to more Information and Contact Us!
Wednesday, December 19, 2012
Wednesday, October 31, 2012
October 2012 - New Stove at the lodge
New Stove at the Lodge!
Over the last several months, the old Garland stove at Emigrant Gap Lodge lost one oven thermostat and lost the heat shield, thermal coupler and metal drip pan in the other oven, making it virtually useless for baking. After checking with commercial range repair shops from Sacramento to Reno and trying to order vintage parts, we determined that it would be less expensive to purchase another used commercial stove than to attempt to repair the old one.
First, we looked at a 1950's Wolf stove on the Summit that had already been converted to propane, but once the owner finally hooked it up to propane for us to see it, we decided that it would be too much of a fixer to take on.
Next, we found a newer Southbend in San Francisco. Unfortunately, it was set for natural gas and was in a walk-up victorian. Even with these two obstacles, it looked to be in working condition and the owner advised it would be ready to go when I came to pick it up.
However, when I arrived at the house, it was still connected to gas and had to be moved through the kitchen doorway, through a narrow hallway, onto a small front landing and down a staircase. The owner, a few of his construction guys and I wrangled it into my truck, then Jim and I took it up to the Gap.
With the help of our dear neighbors, their piano mover, our construction guy and Jim, we got it into the lodge. These commercial stoves weigh a ton. From there, I had to order the propane conversion kit. I also had to clean years of cooking grease from the burners and the griddle/ broiler (the ovens were pretty clean).
Finally I was able to schedule a repair visit with our friends at Amerigas. After about 5 hours of work, the repair tech advised that two of the gauges for the griddle/broiler would not fully turn off and needed to be replaced and that one of the ovens needed a new heat controller. We were able to trade the gauges with the garland but I will need to order the controller for the oven this week.
For now, the new stove is working, one oven is working and oven 2 will be working in the near future. The old stove will be donated to Habitat for Humanity in Grass Valley or to the Salvation Army in Reno.
Here are some pictures of the kitchen as it is now. We still have some cabinetry to add above the old reach in ice box and we need to do lots of painting and trim work - but the kitchen is once more fully functional - ready for turkey and pies for Thanksgiving!
Monday, October 8, 2012
September 2012
Some August changes at the Gap. Since the wiring on most of the top floor is very vintage, Jim decided it was time to run new wiring for the 5 upstairs bedrooms.
We had two options for demolition:
Option 1:
Tear down each bedroom ceiling and run the new wiring from the attic. Later we could tear down all the bedroom walls to run the plugs for each room.
OR
Option 2:
Tear down the ceiling and walls in the hallway and run the wiring down the hall. This option would allow us to a.) place hallway fixtures,light switches and plugs, and b.) place one plug in each room prior to running the multitude of room plugs. Option B also allowed us to refinish the hallway walls and floors.
So guess which option we selected?
You got it - option B. We started by clearing all the loose insulation in the attic that was over the construction area. Then we tore the hallway drywall, wainscoting and trim. This was the messy part. We were careful to remove the wainscoting in case we decided later that it should be reinstalled.
Once the demolition was completed, Jim started running all the wire. That took a while to complete. He added 4 ceiling lights (on dual switches), about 4 plugs, and a wall sconce to the main hallway. He added one plug to each bedroom (with the option for running more later as we complete each bedroom remodel). He also added a ceiling light to the snow entry hallway and the option for an outdoor light on the fire escape.
While this was going on, we had some discussion about the main hallway pantry door. we decided that in the future we would use 1/2 of the pantry space for a stairway up the the attic. The original set up of the pantry door, opening into the pantry space and on the main hallway made the stairway option infeasible. So, as part of the internal framing upgrades, we moved the pantry door to the snow entry hallway and set it up to open outward. I know, sacrificing storage space in the pantry is a sad loss - but getting the 12 feet high, about 80 feet long and over 24 feet wide space in the attic made the sacrifice worth it.
Once Jim completed the wiring, it was time to drywall (our least favorite part of the job). It is not that we hate putting the drywall in place, it is the mess it creates and all the work it takes to do the finish job.
Since the hallway light is basically what we get from the open bedroom doors and from the ceiling lights, the task of finishing the drywall was huge.
Carol completed the painting of the hall and refinished the hallway and the kitchen floors just in time for this summer's family reunion. Jim and Carol rebuilt some vintage schoolhouse pendant lights for the hallway ceiling fixtures and we reused one of the original scones at the end of the hall. Jim reinstalled the furnace vent covers (we have vent covers but no furnace). Pictures were put up to make the hallway homey.
We still have to reinstall the wainscoting - which we hope to complete this fall.
One more remodel job near to completion at the lodge.
We had two options for demolition:
Option 1:
Tear down each bedroom ceiling and run the new wiring from the attic. Later we could tear down all the bedroom walls to run the plugs for each room.
OR
Option 2:
Tear down the ceiling and walls in the hallway and run the wiring down the hall. This option would allow us to a.) place hallway fixtures,light switches and plugs, and b.) place one plug in each room prior to running the multitude of room plugs. Option B also allowed us to refinish the hallway walls and floors.
So guess which option we selected?
You got it - option B. We started by clearing all the loose insulation in the attic that was over the construction area. Then we tore the hallway drywall, wainscoting and trim. This was the messy part. We were careful to remove the wainscoting in case we decided later that it should be reinstalled.
Once the demolition was completed, Jim started running all the wire. That took a while to complete. He added 4 ceiling lights (on dual switches), about 4 plugs, and a wall sconce to the main hallway. He added one plug to each bedroom (with the option for running more later as we complete each bedroom remodel). He also added a ceiling light to the snow entry hallway and the option for an outdoor light on the fire escape.
While this was going on, we had some discussion about the main hallway pantry door. we decided that in the future we would use 1/2 of the pantry space for a stairway up the the attic. The original set up of the pantry door, opening into the pantry space and on the main hallway made the stairway option infeasible. So, as part of the internal framing upgrades, we moved the pantry door to the snow entry hallway and set it up to open outward. I know, sacrificing storage space in the pantry is a sad loss - but getting the 12 feet high, about 80 feet long and over 24 feet wide space in the attic made the sacrifice worth it.
Once Jim completed the wiring, it was time to drywall (our least favorite part of the job). It is not that we hate putting the drywall in place, it is the mess it creates and all the work it takes to do the finish job.
Since the hallway light is basically what we get from the open bedroom doors and from the ceiling lights, the task of finishing the drywall was huge.
Carol completed the painting of the hall and refinished the hallway and the kitchen floors just in time for this summer's family reunion. Jim and Carol rebuilt some vintage schoolhouse pendant lights for the hallway ceiling fixtures and we reused one of the original scones at the end of the hall. Jim reinstalled the furnace vent covers (we have vent covers but no furnace). Pictures were put up to make the hallway homey.
We still have to reinstall the wainscoting - which we hope to complete this fall.
One more remodel job near to completion at the lodge.
Tuesday, January 17, 2012
December 2011
In December the rain and snow just stopped. The temperature rose and like stated
before we had NO SNOW for the semi annual Tahoe Christmas. It was our first
Christmas at the Lodge so snow would have been great. But we all managed to have fun, making
holiday decorations, cutting down the Christmas tree in our woods, hiking,
sledding on very slim snow down the hill, playing games, cooking, singing and
eating. And since there was no
snow, we were able to play basketball at our one room schoolhouse and have a
bonfire on Christmas night.
August - November 2011
Pattie, Melanie, Rylie, Noah, Brandon,
Alayna, Jim, Carol and Katie spent a weekend at the Lodge and attended the
Grass Valley Nevada County Fair – a really fun small town event. The kids tried gold panning. Jim got to ride on the flying
helicopters with Brandon. And Noah
and Brandon rode the motocross motorcycle ride. We had a great time.
Jim had a mini – Cal Berkeley reunion (35th
anniversary of our graduation) at the Lodge with long time friends. Visits to the local waterfall, swimming
and kayaking at nearby lake, bottles of wine and stories & laughter made a
great weekend.
Carol’s best friend Karen and hubby Larry came up for a day
trip to the Lodge toward the end of summer. Carol, Katie, Karen and Larry went
on an explore on some dirt roads to Big Valley Flat (about 12 miles past North
Fork) and got to see the Royal Gorge from about 7000 feet. It was awesome.
Jim installed more windows (to get ready for the Christmas Holiday). To date, he has replaced 15 single pane/cracked/rotted windows with double pane windows. Of course, with each window replacement, there is a need to remove the old wallboard (which seems to be made out of a lightweight fiberboard with little or no insulation behind it), reframe the walls with new 2 by 4s, add insulation, re-wire and re-drywall. The main floor windows are all in now which makes the lodge a lot warmer and less creaky.
In September we got our
first 2011/12 snow so we thought we might have an early winter.
Soon after, Jim got busy
building a snow diverter for our electrical mast on the outside of the Lodge
and repaired some of the loose metal roof covering. He also cut down and cut up 6 LARGE dead cedar trees that
Carol then split for our three cords of winter firewood..
In November – more snow at the Lodge. We had enough snow at Thanksgiving for
Jeremy and Brandon to get in some pre-season sledding. We were all psyched about how much snow we could expect for Christmas Holiday.
Thursday, January 12, 2012
July 2011
The Family Reunion was held the third weekend of July. Lucky for us, most of the snow had finally melted and we were able to visit Lake Valley Lake, Sugar Pine Point on Lake Tahoe, North Fork of the North Fork Falls, and take a wonderful hike at the Old Summit Train Tunnels. Family attended from Washington, Southern California, and Texas. We had a big bonfire one night, feasted on cabbrito and venison, AND we had our second reunion engagement announced (this time - Uncle Bucky).
April - June 2011
In April, May and June it snowed and snowed and snowed. We were beginning to wonder if we would still have snow for the reunion (July).
Jim and Carol were busy working on the kitchen cabinets, adding slate to the entry way and adding tile and fixtures to the upstairs bathrooms (in preparation for the big family reunion in July). We managed to get 5 1/2 bathrooms up and running (minus one shower that was just not completed in time). Everyone overlooked the rough edges (no trim, unfinished stuff).
Jim and Carol were busy working on the kitchen cabinets, adding slate to the entry way and adding tile and fixtures to the upstairs bathrooms (in preparation for the big family reunion in July). We managed to get 5 1/2 bathrooms up and running (minus one shower that was just not completed in time). Everyone overlooked the rough edges (no trim, unfinished stuff).
Subscribe to:
Posts (Atom)










